MAATTR
Parametric

Same rain. Less water.

A trigger is written on the weather. The loss is settled by the ground the weather lands on. Between the two sits a term no wording carries, and the book carries it regardless.

01

Two catchments receive the same rain. One floods. Which did your trigger price?

A hundred millimetres of rain on intact forested ground does no damage. The same hundred millimetres on a stripped catchment next door floods it. The index reads the air, while the loss depends on what the ground does with the water, and between those two sits a term the pricing does not carry.

The trigger fires on both or neither. The loss lands on one. Every payout that fails to match a loss traces back to this gap.

02

What is the 92% made of?

$65bnAsian catastrophe losses, 2025
$5.2bninsured, the lowest since 2017
92%uninsured, against a ten-year average of 83%

Swiss Re Institute, sigma 01/2026 and its Asia analysis, March 2026.

An underwriter prices land before covering it, and pricing needs a read on what the land is. Across most of that ground nobody has done one, because no premium was ever large enough to justify the survey.

So the whole area is declined. Not the damaged parts, but every hectare, because nothing separates them. In most abandoned zones the sound land is the majority, and it is refused alongside the ruined land. That refusal enters the statistics as low penetration. It is also the largest body of unwritten sound risk in the market, and the first carrier able to separate it from the ruined ground writes it alone.

The absence is on the record

Africa and Asia together account for 7.1% of the river gauging stations with available data, against 36.9% for Europe. For observed soil moisture, the latest global water assessment carries data from the United States alone. Swiss Re counts what is uninsured. WMO records that much of it is also uncounted, which makes the 92% a floor.

WMO, State of Global Water Resources 2025, WMO-No. 1402, September 2026.

03

Is your backtest fitted on the ground under the policy today?

A record describes the catchment as it was when the record was made. If upstream cover has since been cleared, rain that once soaked in now runs off, and the record describes a landscape that no longer exists. A longer record only makes the old landscape more convincing.

Vegetation indices and soil moisture readings already sit in index design. Each reads condition on a date. None answers whether the ground has passed the point beyond which it no longer recovers.

A forward claim, dated and still open

An agricultural catchment in Southern Africa, its upstream vegetation cleared over decades, was assessed in May 2026. The main dam sat below a third full. Extreme rain filled and overtopped it in about eighteen hours, topsoil was lost permanently, and almost none of the valley carried cover. The assessment carried one sentence: the next event of this size produces the same outcome, because the condition driving it has not changed. The claim stays open, and anyone can watch it resolve.

04

What would you need to know before setting the trigger?

Hazard, exposure and loss history each describe what happens to the ground. None of them describes the ground itself. A classification of the catchment does, in three statements and nothing else.

  • Condition. Where the ground sits on a five-class scale, from fully productive to exhausted.
  • Threshold. Whether it has crossed the line past which inputs no longer restore it. That crossing has a name, biosenescence, and it does not reverse.
  • Irreversibility marker. The specific physical change that cannot be undone, named, so the finding can be argued with.

It does not forecast an event, a date or a probability. It gives no view on whether to write, decline or reprice. Every file states the conditions under which it is wrong, and any one of them, evidenced, gets the finding restated.

To test it on ground you already carry

One territory that matters on the book, with the wording or trigger specification. Six weeks from agreeing the boundary to a classification file and a sixty-minute readout for the team pricing the risk. Fixed fee, stated on request. Nothing further is committed.

Somewhere on your book a trigger is priced on ground that no longer exists. Somewhere off it sits sound ground nobody has written. Which do you want to find first, and who finds it if you do not?

Send the territory